How long does it take?

Category: General

A complete Ghost production, i deliver within 7 days. After you have checked it, i do optional 2 revisions within 7 days. So all in all maximal 14 days. Or within 7 days if there are no revisions to do. 

A complete Remix production the same, i deliver within 7 days. After you have checked it, i do optional 2 revisions within 7 days. So all in all maximal 14 days. Or within 7 days if there are no revisions to do. 

A complete Mixdown, i deliver within 4 days. After you have checked it, i do optional 2 revisions within 4 days. So all in all maximal 8 days. Or within 4 days if there are no revisions to do. 

A complete Master, i deliver within 2 days. After you have checked it, i do optional 2 revisions within 2 days. So all in all maximal 4 days. Or within 2 days if there are no revisions to do.

(days i don’t have an answer from You or days until the money arrives are excluded)


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *